Rising and Lateral Upgrade

Electrical Installation
Southwark Council
2 Month Contract
Valued at £120K

Project Overview

BCS Electrical was contracted by Southwark Council to undertake a rising and lateral upgrade of the electrical systems across multiple residential buildings. This project was critical for enhancing the electrical infrastructure, improving capacity, and ensuring compliance with the latest regulations. The installation was completed within a two-month timeframe, focusing on maintaining safety and minimal disruption to residents.

Project Information

Project Objectives

The primary objectives of the project included:

  • Upgrading electrical systems: To improve the efficiency and reliability of the electrical supply in residential buildings.
  • Ensuring compliance: Meeting all current electrical regulations and safety standards.
  • Minimising disruption: Completing the upgrades efficiently to ensure residents experienced minimal inconvenience.

Approach

BCS Electrical commenced the project with a comprehensive assessment of the existing electrical infrastructure in the targeted buildings. This involved:

  1. Detailed Site Inspection: Our team conducted thorough inspections to identify the specific requirements for the rising and lateral upgrades.
  2. Planning and Coordination: Based on the findings, we developed a detailed plan outlining the scope of work, timelines, and key milestones, ensuring clear communication with Southwark Council throughout the process.
  3. Installation Process: The upgrade involved:
    • Replacing outdated electrical wiring and panels with modern, compliant units to enhance capacity and safety.
    • Implementing new rising mains and lateral connections to improve the distribution of electrical power throughout the buildings.
    • Upgrading earthing and bonding systems to ensure compliance with safety regulations.
  4. Testing and Commissioning: After installation, our team performed rigorous testing to verify the functionality of the new systems and ensure they met all safety standards.
  5. Documentation and Handover: Comprehensive documentation detailing the upgrades, as well as training for Southwark Council staff on the new systems, was provided to ensure proper maintenance and operation.

Results

The project was successfully completed within the two-month timeframe, with minimal disruption to residents and daily operations. Key outcomes included:

  • Enhanced Electrical Capacity: The rising and lateral upgrades significantly improved the efficiency and reliability of the electrical systems, accommodating increased demands from residents.
  • Regulatory Compliance: All installations adhered to current electrical safety standards, ensuring the buildings were compliant and safe for occupancy.
  • Improved Safety: The upgraded earthing and bonding systems enhanced overall electrical safety in the properties, reducing the risk of electrical faults or failures.

Conclusion

The rising and lateral upgrade project for Southwark Council demonstrates BCS Electrical’s commitment to delivering high-quality electrical solutions tailored to the specific needs of our clients. Through meticulous planning and execution, we ensured the project was completed efficiently, significantly enhancing the electrical infrastructure of the residential buildings involved.

For more information on how BCS Electrical can assist with your electrical upgrade needs, contact us today.