LED Adverting Tower

Fuseboard Upgrades
LED Adverting Tower
2 Month Contract
Valued at £120K

Project Overview

BCS Electrical was engaged to undertake fuseboard upgrades for an innovative LED advertising tower, a prominent feature designed to enhance visibility and attract attention. This project, executed within a two-month timeframe, was crucial for ensuring the reliability and safety of the electrical systems powering the advertising technology.

Project Information

Project Objectives

The main objectives of the project included:

  • Upgrading the electrical infrastructure: To support the high demands of the LED advertising system.
  • Ensuring compliance: Adhering to the latest electrical safety standards and regulations.
  • Minimising downtime: Completing the upgrades efficiently to avoid interruptions to advertising operations.

Approach

BCS Electrical initiated the project with a detailed assessment of the existing electrical system, focusing on the current fuseboards. Our team conducted thorough site inspections to identify any deficiencies and requirements for upgrades.

Following this assessment, we developed a structured plan outlining the scope of work, timelines, and critical milestones. The installation process involved replacing outdated fuseboards with new, high-capacity units designed to support the power requirements of the LED advertising tower. We also upgraded the earthing and bonding systems to enhance overall safety.

After the installation, our electricians conducted comprehensive testing of the new systems to ensure they operated efficiently and met all safety regulations. Detailed documentation was provided, along with guidance for ongoing maintenance.

Results

The project was completed successfully within the two-month timeframe, with minimal impact on the operations of the LED advertising tower. Key outcomes included:

  • Enhanced Reliability: The upgraded fuseboards significantly improved the electrical reliability, ensuring consistent operation of the LED advertising system.
  • Regulatory Compliance: The new installations met all current electrical standards, ensuring the safety and legality of the advertising tower’s operations.
  • Increased Capacity: The new high-capacity fuseboards provided the necessary support for the power-intensive LED displays, allowing for future technological enhancements.

Conclusion

The fuseboard upgrade project for the LED advertising tower illustrates BCS Electrical’s dedication to providing high-quality electrical solutions tailored to meet our clients’ specific needs. Through meticulous planning and efficient execution, we ensured that the project was completed on time, significantly enhancing the reliability and safety of the advertising tower’s electrical infrastructure.

For more information on how BCS Electrical can assist with your electrical upgrade needs, contact us today.